Cement Equipment, Cement Machinery,Cement Production Line
CMHE >> Building Materials Equipment >> Bulk machine >> Cement bulk loader

Cement bulk loader

Miss Shao : +86-1862762655

TEL: +86-513-88400999 FAX: +86-513-88400998 E-mail: jszk@vip.163.com

 

Cement bulk loader is the equipment which conveys clinker(<=50mm) in silo to clinker bulk loading ship and truck. Bottom cement clinker bulk loading equipment is mainly composed if manual bar valve, motorized fan valve, hoisting device, flexible discharge device, dust suction hoses, capacitor limit switch, electric control system etc. The user may also select side silo bulk loader. 

Technical parameter of cement bulk loader
 
Technical parameter
Conveying material
Cement clinker or similar lump material
Material density
Clinke1.45t/m3
Material temerature
<=80℃
Material granularity
<=50(mm)
Loading capacity
200t/h
Flexible distance of discharge head
Customized it according to the customer’s requirement.
Manual bar valve
410x410mm
Motorized fan valve
700x700mm
Pneumatic bar valve
700x700mm
Hoister
8m/min 20KN 3KW
Capacitor limit switch
VEGACAP11 Probe length:400mm
Probe diameter:ф20/ф15mm
Work pressure:6300KPa
Work temperature:-40℃-200℃
Loading power
3.75Kw/5.2Kw
Working principle of cement bulk loader
When transport vessel enters loading position, take the relative rods out of the bar valve. Press the button of DOWN in the control panel. After discharge head is to the position, the power of lifitng motor will cut off automatically. Press the button of LOADING, start to discharge. Auxiliary equipment will start work. The dust caused by discharge will enter the inlet hopper. Discharge head from flexible hose will be purified by dust filter. When material in the discharge head is full, discharge head will lift, at the same time alarm. Lifting distance will be setted before loading. If it is lifted one meter, the time of time relay will be adjusted at the same time T=1/V. During the lifting, the loading is always continuing. When the discharge head is full, do the above action again and again. After reaching the full position, press the STOP button to make the motor reverse vibrat or close the fan valve and stop other equipments. After it is stopped, the discharge head can be lifted for some distance from the material to ensure the movement of transport vessel. Then check the second discharge work position till the whole silo is full.

 

 

That may interest you:

Fax:+86-513-88400998 Tel:+86-513-88400999 E-mail:jszk@vip.163.com
Add:Si Jin Industrial Park in Baidian couty, Nantong city, Jiangsu Province,China
© JiangSu China Mining Heavy Equipment Co.,Ltd. BY Tiangen Design
备案号:苏ICP备13032710号-1

SUBORDINATE |CERTIFICATES | Privacy Policy | Sitemap |